Trim work done, for the most part.

Here is the pictures from the last two days of construction.  We are basically done with the trim now.  I have a few small things to do.  Little details to trim yet but for the most part it is done.  That feels pretty nice.

One more coat of paint on the desk should finish that.  I think I might make some shelves for the desk but that will be in the future.  We need to give the floor a good cleaning.  Get the bathroom flooring in, and start working on the cabinet doors and drawers.  That is going to be the most technically difficult stage of the project.  Having never built drawers or cabinets before, I have a lot to learn.  I also have a lot of tools and jigs that need to be acquired and built.

Number one is a crosscut sled for the table saw.  I also need a dado setup and perhaps may have to make or buy a router table.  I need to decide which type of drawers and doors to make once that is finalized, I can start making some of this stuff.  Until then, we are going to clean, and probably start moving some stuff in.

2 thoughts on “Trim work done, for the most part.

  1. OMG
    You got some work done!
    Gonna come up some day in the next couple weeks and look you up
    Do some fishin etc
    R

Leave a Reply

Your email address will not be published. Required fields are marked *